Saturday, August 21, 2010

HALFWAY!!!!

We started our house remodel exactly 2 months ago, today.

Heating is in, plumbing (copper pipes!) is in, next up is electrical, followed by sheetrock... enough talk, on to the picturesOur new front door
The living room with new entrywayThe kitchen. The blue tape on the floor denotes where our cabinets will go. The black pipe in the front right of the picture is the waste line where the sink will go.The dining room and family room (kitchen to the left)Samuel standing in his/Shira's/the guest bathroom
Steve wanted me to include a picture of the heating ducts in the attic - he's very excited about the idea of having a heater. Notice also, that beautiful copper pipe.
Our bathroomOur bedroom - look at that closet!!!Our former master bedroom, currently supply storage, soon to be Shira's and Samuel's room

1 comment:

siobhanarama said...

oooh copper pipes. good.