We started our house remodel exactly 2 months ago, today.
Heating is in, plumbing (copper pipes!) is in, next up is electrical, followed by sheetrock... enough talk, on to the pictures

Our new front door


The living room with new entryway

The kitchen. The blue tape on the floor denotes where our cabinets will go. The black pipe in the front right of the picture is the waste line where the sink will go.

The dining room and family room (kitchen to the left)


Samuel standing in his/Shira's/the guest bathroom

Steve wanted me to include a picture of the heating ducts in the attic - he's very excited about the idea of having a heater. Notice also, that beautiful copper pipe.

Our bathroom

Our bedroom - look at that closet!!!

Our former master bedroom, currently supply storage, soon to be Shira's and Samuel's room
1 comment:
oooh copper pipes. good.
Post a Comment